Thursday, January 31, 2008
It's almost 3a.m. I spend 3 hours working on my CMSK brochure from 12a.m to now. I was very satisfied with it :)
Then I after I completed the inside of the brochure, I went to work on the outside. To save time, I use back the same template.. I was nearly done with the outside of the brochure too.
THEN I PRESSED "CONTROL+S" AND SAVE OVER THE ORIGINAL FILE!
How stupid can I be? Now the inside of the brochure, which I spend 1.5 hours on, is being saved over by the stupid outside of the brochure which I only spend half hour on. WTF!
Now I lose sleep over it. Just wonderful. What am I going to show the lecturer tomorrow?
Then I after I completed the inside of the brochure, I went to work on the outside. To save time, I use back the same template.. I was nearly done with the outside of the brochure too.
THEN I PRESSED "CONTROL+S" AND SAVE OVER THE ORIGINAL FILE!
How stupid can I be? Now the inside of the brochure, which I spend 1.5 hours on, is being saved over by the stupid outside of the brochure which I only spend half hour on. WTF!
Now I lose sleep over it. Just wonderful. What am I going to show the lecturer tomorrow?